Schools
Geronimo High School
22/12/08 14:09

Click to see more pictures
Facility: five domes: two 102’ domes for classrooms, a 72’ dome for administration, a 72’ dome for the cafeteria, and a 154’ dome for the gym. All five domes are on a 10’ stemwall.
Design: LPDJ
Architect: LPDJ
Shell Construction: South Industries, Inc.
Construction Management: KDW, Inc.
Completed: Still under construction
Construction Cost: About $4.1 million
Saint Jo High School
26/11/08 14:46

Click to see more pictures
Facility: 126’ dome on 12’ stemwall with EIFS elasticmeric finish
Design: Crandall Design Group
Architect: Crandall Design Group
Shell Construction: Dome Technology, Inc.
Construction Management: KDW, Inc.
Completed: September 2006
Construction Cost: About $1,282,000
Hinton High School
24/11/08 15:50

Click to see more pictures
Facility: 148’ dome on 25’ stemwall with EIFS elastimeric finish
Design: Crandall Design Group
Architect: Crandall Design Group
Shell Construction: Dome Technology
Contract Administration: KDW, Inc.
Completed: November 2006
Construction Cost: About $2,844,000
Okemah High School
24/11/08 15:50

Click to see more pictures
Facility: 148’ dome on a 20’ stemwall with exterior EIFS elastmeric finish
Design: Michael McCoy Architects
Architect: Michael McCoy Architects
Shell Construction: Dome Technology, Inc.
Construction Management: KDW Inc.
Completed: October 2007
Construction Cost: About $2,253,000
Beggs High School
24/11/08 15:50

Click to see more pictures
Facility: 2 domes: A) 160’ dome one 24’ stemwall, exterior finish is stained concrete, and B) 112’ dome on 10’ stemwall, exterior finish is stained concrete.
Design: Michael McCoy Architects
Architect: Michael McCoy Architects
Shell Construction: Dome Technology, Inc.
Construction Management: MCI, Inc./KDW, Inc.
Completed: November 2005
Construction Cost: About $2,935,000
Trinidad High School
24/11/08 14:52

Click to see more pictures
Facility: Multipurpose gym and field house for school of K-12 grade. The 130’ diameter Dome will seat 800. The 44’ diameter field house by the football field provides restrooms and concessions.
Design: Crandall Design Group
Architect: Crandall Design Group
Shell Construction: Monolithic Constructors, Inc.
Construction Management: MCI, Inc./KDW, Inc.
Completed: October 2004
Construction Cost: About $1,192,000
Texhoma High School
24/11/08 14:50

Click to see more pictures
Facility: Two domes, 108’ high school classroom with upstairs library and 66’ cafeteria, both on a 10’ stemwall, exterior finish is brick. The cafeteria serves entire school.
Design: Crandall Design Group
Architect: Crandall Design Group
Shell Construction: Dome Technology, Inc.
Construction Management: MCI, Inc./KDW, Inc.
Completed: Year 2000
Construction Cost: About $1,500,000
Avalon High School
20/11/08 20:59

Click to see more pictures
Facility: Multipurpose Center for 250 students in Pre-Kindergarten to 12th grade. This dome measures 124’x25’ with a total height of 37 feet. It features seating for 720, a full-size basketball court, four locker rooms, a front foyer concession, and bathrooms.
Design: Monolithic Dome Institute
Architect: Rick Crandall
Shell Construction: Dome Technology Inc.
Construction Management: MCI, Inc./KDW, Inc.
Completed: Year 2002
Construction Cost: About $1,145,000
Italy High School
18/11/08 15:48

Click to see more pictures
Facility: Monolithic Dome,two-story,148’ diameter as Multipurpose Center,that includes gymnasium with walking track, seating for 1500,auditorium,classrooms for special activities and concrete parking area and drives.
Design: Monolithic Dome Institute
Architect: Rick Crandall
Shell Construction: Dome Technology Inc.
Construction Management: MCI, Inc./KDW, Inc.
Completed: Year 2001
Construction Cost: About $1,818,000